The bottom line is the major gold miners just reported yet another excellent quarter. Higher prevailing gold prices and recovering production drove surging revenues.
Year to date, the Company has drilled 14,891 metres in 123 shallow drill holes and is 90% through the 2021 base program of 16,500 metres. As the Company is preparing for an updated Mineral Resource Estimate (“MRE”) anticipated later in 2021
Including 25.07 g/t Gold over 9.7 m and 39.21 g/t Gold over 3.1 m -- A multi-rig resource expansion and discovery drilling program is now underway along strike of the known vein systems.
Gold Resource Corp. has confirmed the up-dip extension of the Switchback vein system, approximately 30 meters (two mine levels) above the existing mine workings and has intersected..